BEVERAGE FILLING EQUIPMENT — BUYER RFQ WORKSHEET Prepared by Allot Tech (Suzhou) Co., Ltd. | Brand: Allot Tech Public contact: Mr Kcal Project enquiry: https://beveragefillingequipment.com/request-a-quote/ Worksheet revision: 2026-09-22 Purpose: Record the same equipment basis for every bidder. Blank fields are unknown, not zero. This is not a quotation or final design. 1. PROJECT AND REFERENCE SKU Project identifier / revision / date: New project or upgrade: Beverage and approved preservation route: Carbonation / viscosity / particles / foaming characteristics: Product temperature and pressure at filler inlet (or TO CONFIRM): Container material / nominal volume / drawing and revision: Closure or can end / drawing and revision: Empty-container source (purchased / in-house / returnable): Required GOOD output / unit / counting point: Net production time / SKU mix / changeover and cleaning allowance: Label / code / finished-pack pattern: 2. MODULE AND RESPONSIBILITY REGISTER For each function below, state: REQUIRED / CONDITIONAL / EXISTING / BUYER-SUPPLIED / EXCLUDED / TO CONFIRM Then name the owner, equipment tag and evidence needed. Water and ingredient preparation: Mixing / thermal process / carbonation: Product holding and transfer: Empty-container feed / preparation: Filling / closure or seaming: Fill / closure / leak inspection and reject confirmation: Labeling / coding / surface preparation: Secondary packing / pallet handoff: CIP supply / return / manual cleaning boundary: Conveyors / mechanical connections / controls: 3. INTERFACES Upstream delivered product condition and sustained flow: Product buffer: low limit / normal level / high limit / usable volume: Container transfer: height / pitch / guide arrangement / samples: Utilities at equipment connection: quality / pressure / peak flow / owner: Electrical supply: voltage / frequency / phases: Control signals and safe response to upstream/downstream stop: Space, access, drain and maintenance constraints: Existing equipment evidence and unresolved compatibility questions: 4. BIDDER RESPONSE (REPEAT FOR EACH REQUIREMENT) Requirement ID: Requirement and testable acceptance condition: Included / Option / Excluded / Clarification needed: Deviation and consequence: Evidence / drawing / revision: Price item reference and separately quoted missing scope: Responsible party: 5. ACCEPTANCE AND HANDOVER FAT/SAT location, reference materials, duration and counting point: Good/reject quantity definition and allowed interventions: Inspection defect samples and reject-confirmation test: Documents / manuals / software backup / spare-parts register: Training / commissioning / travel / service exclusions: Open items / owner / due date: 6. COMMERCIAL COMPARISON BASIS Currency and quotation validity: Delivery destination and agreed delivery basis: Equipment total: Confirmed missing modules: Interconnections and site work: Testing, installation, training and spares: Unpriced or unconfirmed items (DO NOT TREAT AS ZERO): 7. RESPONSE AND CHANGE CONTROL Bidder quotation identifier / revision / date: Reference requirements and drawing revisions used by this offer: Requirement status: CONFIRMED / CONDITIONAL / ALTERNATIVE / EXCLUDED / OPEN Each condition or deviation / equipment consequence / cost item reference: Evidence owner / next action / due date / closure document: Confirmed additions already included in base amount (AVOID DOUBLE COUNTING): Do both quotations use the same currency and agreed scope? YES / NO / OPEN Known-cost comparison tool: https://beveragefillingequipment.com/beverage-filling-equipment-price/#quote-comparison Submit the reviewed requirements using the enquiry page above. Final equipment, performance, supply and service scope require the project quotation and signed technical agreement.