Product and container file
Describe the beverage, filling condition, preservation route, container material and size, closure and available drawings or samples.
- Beverage and recipe basis
- Bottle or can drawing
- Closure and label
- Reference SKU
A clear project brief reduces speculative equipment selection and makes supplier proposals easier to compare. Mark unknown items honestly; technical confirmation is better than invented data.
Send the beverage and process basis, container and closure details, reference output, commercial pack, existing equipment, factory layout, utilities, destination, schedule and required supplier responsibility.
The first enquiry can contain unknowns. Before supplier comparison, convert critical facts into controlled requirements and give every open item an owner.
| Input block | First enquiry can state | Before quotation comparison | Before order |
|---|---|---|---|
| Beverage process | Product family and known filling condition | Approved route or named technical-confirmation item | Controlled process and filler-inlet requirement |
| Container and closure | Sizes, material and available samples | Controlled drawings, revisions and format matrix | Approved production samples and change parts |
| Output | Desired bottles/cans per hour | Reference SKU and good-output boundary | Acceptance conditions, duration and exclusions |
| Factory and utilities | Known voltage, layout and services | Point-of-use conditions and battery limits | Approved interfaces and site-readiness owner |
| Project delivery | Destination and target timing | Document, FAT, shipping and site-support scope | Signed responsibility, milestone and change-control basis |
Decision boundary: Do not delay the first contact because every field is unknown. Mark unknowns honestly, then close the ones that control equipment selection before purchase.
The example rows show the level of control. Replace the examples with project facts and assign verification only where the condition can actually be reproduced.
| Field | What to record | Example response status | Verification route |
|---|---|---|---|
| URS ID and revision | Unique number, issue date and approved revision | Received / superseded | Document-control check |
| Priority | Must, preferred or to be confirmed | Accepted / proposed deviation | Buyer approval record |
| Requirement | One function, interface or measurable result | Comply / deviate / clarify | Drawing, document, inspection or test |
| Project basis | Referenced product, package, output or site document | Basis confirmed / exception listed | Revision match |
| Acceptance criteria | Condition, method, duration and result record | Method agreed / limitation stated | FAT, SAT or site record |
| Change status | Owner, decision, date and affected documents | Open / approved / closed | Signed change and updated index |
Decision boundary: Avoid requirements that combine several decisions in one sentence. One identifier per testable obligation makes deviations and acceptance evidence easier to trace.
Describe the beverage, filling condition, preservation route, container material and size, closure and available drawings or samples.
State good-output target, operating hours, layout, access, electrical supply, air, steam, cooling, water and drainage.
List existing equipment, desired end pack, automation, standards, inspections, shipping destination, schedule and support expectations.
Every equipment decision has an upstream condition, a current function and a downstream handoff.
Known facts, drawings, samples and clearly marked unknowns.
Equipment scope, open questions, interfaces and assumptions.
Project-specific technical and commercial proposal.
The supplied Allot Tech 2026 catalog supports named equipment groups such as water treatment, beverage preparation, CIP, bottle handling, filling platforms, labeling, conveying and secondary packaging. It does not make every module mandatory for every project.
Company identity, contact route, named equipment categories and catalog reference flows.
Application routes and model-family context from the supplied catalog.
Output, power, dimensions, materials, components, process conditions, availability, price and service scope.
Invented performance, price, certifications, projects, reviews, factory claims or guarantees.
These answers frame the equipment decision. The final process and equipment remain project-specific.
Select technical recommendation and provide the product details available; the final route remains subject to confirmation.
They are helpful but not mandatory for the first enquiry. They become important before final configuration.